Industrial refrigeration and electromechanical projects of high quality


PASSIAS FACTORY S.A.

Click to enlarge

Year Build

2008

Project Duration

4 MONTHS

Location

IOANNINA

Project Description

  • Five cold room doors were replaced with new PFI doors, two of them electrically operated with the innovative POWERMATIC control panel.
  • Two new small cold rooms were built.
  • Klimatisation system was installed in the pre-rooms and corridors.
  • Data logging and monitoring software was installed.

 

Offered Services

  • Industrial Cooling