Categories
Golden Suites and Spa boutique hotel
Project Description
The project included
- airconditioning of the hotel rooms with a DAIKIN VRV system
- airconditioning of main and auxilliary halls with DAIKIN SkyAir Inverter systems
-domestic hot water, heating and swimming pool heating with a mix system of solar heating, DAIKIN ALTHERMA and oil boiler heating system
- swimming pool construction with ASTRAL VICTORIA PLUS 3HP pump, CANTABRIC FILTER, and ASTRAL TITAN HEAT EXCHANGER
Offered Services
- Heating, air conditioning and ventilation
- Swimming pools